The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to Australia in A$. Local
The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to Australia in A$. Local
Contact us for more information about Ceramic | Australia
Contact us for Australia
Contact Us
ZTW Environmental Protection Technology Co., Ltd. focuses on the field of industrial flue gas treatment, and is committed to providing integrated solutions for denitrification, desulfurization, defluorination, dust removal and ammonia removal with ceramic catalytic filter tubes and ceramic fiber filter tubes as core technologies. Relying on the concept of ceramic integrated design, the company integrates catalysis, filtration and dust removal functions into high-performance ceramic tubes. Its denitrification efficiency is more than 95%, and its dust removal efficiency exceeds 99.99%, which is suitable for high-pollution industries such as glass kilns, steel, and coking.
ZTW Tech supplies ceramic catalytic filter elements and ceramic fiber filter elements to Australia industrial operators. Local project pricing is quoted in A$ (AUD), and every quotation includes technical drawings and a technical data sheet in metric units.
Key industries served in Australia
coal-fired power generation
iron and steelmaking
cement and lime kilns
waste-to-energy plants
gas processing
Standards and compliance for Australia
AS/NZS 4136 (certified particulate filters)
AS 2912 (filter media)
MCA/WorkSafe QH7
National Environment Protection measures
Applications by industry
Coal-fired power generation
Boiler and ESP inlet gas on black coal units typically runs at 140-160°C with fine particulate; the first ceramic element stage can be installed ahead of the ESP where baghouse retrofit is not feasible.
Cement and lime kilns
Rotary kilns with a burning zone at 1450°C and precalciner combustion at around 1050°C. The NOx reduction duty sits after the calciner, where the flue gas is still hot enough for the catalytic element to hold its conversion efficiency.
Waste-to-energy plants
Grate-type and moving-grate incinerators with flue gas at 850-950°C. Ceramic fibre elements replace the high-temperature bag stages that need repeated replacement under Australian fire and dust loading conditions.
Regulatory compliance in Australia
Australian industrial emissions are licensed by state environment regulators under the National Environment Protection (Used Air Pollutants) Measures and the relevant EP Act or equivalent. Certified particulate filters for this market are commonly specified to AS/NZS 4136, with filter media classified to AS 2912, and equipment suppliers are expected to hold recognised third-party certification as well as provide an accredited sampling and monitoring report.
Supply, lead time and logistics
Quotations are issued in AUD with 30-day validity. Elements are manufactured in China and shipped by sea to Melbourne, Sydney or Brisbane, typically 22-30 days, or by air freight in 6-9 days for urgent replacement. Stocked diameters are available for dispatch within 3 days with full installation documentation.
Australia
Technical support is provided in English with A$ quotation and local lead-time guidance. Request a free filter sample or discuss an OEM / ODM programme.
Search coverage for Australia
Content for Australia is indexed in Google Australia, Bing Australia, Yahoo Australia.
Australia
Australian
NSW
Queensland
Victoria
WA
Frequently asked questions
Do ceramic filter elements meet Australian certification requirements?
Yes. We supply elements with AS/NZS 4136 certification support and material data referencing AS 2912 classification, together with the permeability, burst strength and temperature resistance test data needed for an EP Act licence variation or a supplier declaration.
What are the shipping terms and lead times to Australia?
Standard elements ship sea freight in 22-30 days to Melbourne, Sydney or Brisbane, and 6-9 days by air. Stock items go out within 3 days. Each quotation lists the port of discharge, the estimated arrival and the Incoterm so the shutdown window can be booked.
Can you support an Australian EPC contractor?
Yes. We provide the design basis, installation drawings, torque specifications and commissioning checklists, and we work with EPC contractors on the performance test protocol so the guaranteed figures match what the site measures.
ZTW
We will reach you within 1 hour.
2026-11-26 14:33:43
Hello, welcome to ZTW. Please reach out to us at any time.
We have received your ticket and will get back to you within 24 hours.